Industrial design



Optim Crane cab for frame and bridge cranes

Overview   Process  

Task: Create a design concept for a crane cab to be developed and produced.

The cab is designed for single- and double-beam 125-tonnes capacity cranes. It has panoramic windows, to install with careful regard to production technologies, that provide a significantly larger field of view.



Release date: January 23 2009

Cast:

artistic director
Artemy Lebedev
art director
Timur Burbayev
industrial designers
Alexei Sharshakov
Maxim Chashchin
Maxim Shkinder
Benoit Patoureaux
modelers
Alexander Pozdeyev
Yevgenia Yeremeyeva
visualizer
Dmitry Dolgikh
manager
Vera Dorofeyeva



Swinging windows are easy to clean, and sliding ones allow the crane operator to communicate with strappers and scaffolders





Share this page:


© 1995–2012 Art. Lebedev Studio