• Industrial design
  • Optim Crane cab for frame and bridge cranes

    Overview   Process  

    Task: Create a design concept for a crane cab to be developed and produced.

    The cab is designed for single- and double-beam 125-tonnes capacity cranes. It has panoramic windows, to install with careful regard to production technologies, that provide a significantly larger field of view.



    Release date: January 23 2009

    Cast:

    artistic director
    Artemy Lebedev
    art director
    Timur Burbaev
    industrial designers
    Aleksey Sharshakov
    Maksim Chaschin
    Maksim Shkinder
    modelers
    Aleksandr Pozdeev
    Evgenia Eremeeva
    visualizer
    Dmitry Dolgikh
    manager
    Vera Dorofeeva



    Swinging windows are easy to clean, and sliding ones allow the crane operator to communicate with strappers and scaffolders