The making of the second version of the design for the studio’s café and store on Nikitskaya

Overview   Process   Real Life  

While the renovation is in progress, we put up a temporary sign and posters with peepholes.

als lik process 01

Cleaning out the first floor and the basement.

als lik process 02
als lik process 03
als lik process 04
als lik process 05

Starting the renovation.

als lik process 06

Looking at door samples for inspiration.

als lik process 07

Experimenting with the composition of the sign.

als lik process 08
als lik process 09
als lik process 10

Simultaneously drafting and producing the bar counter.

als lik process 11

Inspired by the cast ornaments of Zinger sewing machines we create our own version of the ornament.

als lik process 12
als lik process 13
als lik process 14

Buying chairs at a flea market and restoring them.

als lik process 15

Some details require manual adjustment on location because of the poor geometry of the place. Initially we were planning to add window blinds and additional seats on window sills, but it didn’t work out.

als lik process 16

Decorating the window with a picture frame.

als lik process 17

The steps turned out to be quite a challenge: the staircase had to fit into a tight space and meet all fire safety requirements.

als lik process 18

First we plan the location of the trade zone, the utility area and the bathroom.

als lik process 19

Layout with the bathroom on the first floor.

als lik process 20

Zoning of the ceiling.

als lik process 21

Deciding to expand the kitchen and leave the bathroom in the basement.

als lik process 22

Imagining how the store will look in color.

als lik process 23

And with an undulating ceiling.

als lik process 24
als lik process 25

Using mirror panels to visually increase the size of the room.

als lik process 26

Flooring options.

als lik process 27

Checking out sales counter lighting.

als lik process 28

We need to come up with a way to decorate the column.

als lik process 29

Graphic decoration options for the walls: an illustration, a photo panel, a monochrome and a two-colored finish.

als lik process 30

A cork or a chalk board for the wall?

als lik process 31

Choosing wall decorations. Making a menu sketch in the shape of a card.

als lik process 32

Not forgetting about a corner with legal documents.

als lik process 33

We get the idea to create our own uniform but ultimately it gets dropped.

als lik process 34
als lik process 35

Initially, when we had two bathrooms, we wanted to make one of them in the Czar style and the other as a torture chamber.

als lik process 36

Later we decide one bathroom is enough.

als lik process 37

Checking to see if the dimensions are correct.

als lik process 38

Developing a platform to compensate for different floor levels.

als lik process 39

Starting the realization process according to the drafts.

als lik process 40

The grand opening!

als lik process 41
als lik process 42

Only the terrace remains neglected. Taking pictures of the location and trying out different ways to place the objects on sketches.

als lik process 43
als lik process 44

We find a gas pipe going along the façade. According to the standards, any object must be at a distance of no less than 2 meters (6,5 feet) from a gas pipe. Correcting the layout.

als lik process 45
als lik process 46

Placing the furniture and coloring the umbrellas.

als lik process 47

Choosing weatherproof outdoor furniture.

als lik process 48

Now we have to create a new sign. Creating a marquee with the studio illustration.

als lik process 49

Drafting the sketch of the marquee and the entrance.

als lik process 50

Trying various options for the bracket and the side extender. Exploring the chosen direction: we need to inscribe studio elements into the casting.

als lik process 51
als lik process 52
als lik process 53
als lik process 54